(2019) When will a certain road in Hardin County get rock?

No timelines are being given. With 779 miles of unpaved roads to maintain, the secondary roads crew will be stretched very thin. The goal is to continue hauling as often as possible to as many different locations as possible. Hardin County does not want to concentrate their efforts in one specific spot with such a large-scale disaster. The County is pursuing outside help in placing the rock to speed up the process, but it will most likely take the majority of 2019 to get back to normal.

Show All Answers

1. (2019) When will a certain road in Hardin County get rock?
2. When will the frost boils be fixed?
3. When will the county blade my road?
4. Why is the grader driving with his blade up?
5. When will the snow be removed?
6. Who maintains the county line roads?
7. Why is there water or snow in the ditch still?
8. Can I outlet a tile or septic system into the ditch?
9. How do I build a new driveway or extend an existing driveway?
10. Can I get a culvert pipe from Hardin County?